Exciting stuff! Here are the main parts of the Septic System almost ready for backfill. Next will be the leach field lines and then we'll finally move on to the foundation.
The orange "Z" shape in the lower left shows the foundation wall. To the left will be the screen porch and to the right will be the garage.
On the right is the new driveway location.
The backhoe is sitting in front of the new garage.
Driveway area from the existing rooftop deck. The yellow job box is inside the proposed garage.
New sewer line exiting the house.
No comments:
Post a Comment