Sunday, May 27, 2012
More Concrete Demolition
This time I'm using a gas powered diamond blade wet saw to cut off the south side parapet wall where the addition will connect.
New Septic System
The new septic system is now operational ind hooked up to the house. Here are some pictures of the final steps of the leach field construction and finish grading.
Thursday, May 17, 2012
Patio Roof Demo
I demolished the patio roof which was made of reinforced concrete. This will make way for the new Kitchen which will occupy this corner of the house.
Thursday, May 3, 2012
A big tank for poo
Exciting stuff! Here are the main parts of the Septic System almost ready for backfill. Next will be the leach field lines and then we'll finally move on to the foundation.
The orange "Z" shape in the lower left shows the foundation wall. To the left will be the screen porch and to the right will be the garage.
On the right is the new driveway location.
The backhoe is sitting in front of the new garage.
Driveway area from the existing rooftop deck. The yellow job box is inside the proposed garage.
New sewer line exiting the house.